Project Timeline

Renewable Energy for a Sustainable World.

Next Steps

WHAT’S NEXT?

Our Experienced Energy specialists will guide you through the process every step of the way.

1. QUALIFY

Discuss your home with a qualified solar consultant and fill out an enrollment application.

2. QUALIFYING SITE ASSESSMENT

Prior to your system design, our training professionals will complete an assessment of your property to develop the most beneficial and efficient system for your home.

3. SYSTEM DESIGN

After we have assess the site, our engineering team will analyze and create a custom system specifically for your roof and home.

4. PERMITS

Our permitting experts acquire the appropriate documentation from corresponding municipalities and ensure completion as necessary to move forward with your solar array installation.

5. INSTALLATION

When all permits and documentation is approved, we will contact you to schedule your installation. With our highly trained and skilled team.

6. FINAL INSPECTION

Once installation is complete we will arrange an inspection to ensure the system complies with local county requirements. We will inform you when this has been scheduled.

7. CONNECTION TO YOUR UTILITY

Once the final inspection is complete, we will contact your utility company and arrange for them to upgrade your meter to a net meter so you may transfer power to or from the grid and also keep it stored until your home requires the use of it.

8. ENERGY INDEPENDENCE

Once your utility company has granted us permission to operate (PTO), we will let you know you are ready to “Flip the Switch” and begin powering your home with the sun! Congratulations you are now part of our Great Green Movement and ready to enjoy the benefits of producing your own solar energy.

READY TO SAVE MONEY ON ENERGY?

How it works

THE IMPACT OF GOING SOLAR

Putting solar panels on your home does good for your wallet, and for the environment.

SAVE 2,400 TREES
CANCEL OUT 60,000 MILES OF DRIVING
SAVE 80,000 GALLONS OF WATER
CANCEL OUT 16 TONS OF BURNED COAL
Scroll to Top